We provided an in-house engineered design using multiple layers of 75mm Cellweb® TRP, filled with foamed glass aggregate.

Discover how Geosynthetics Ltd engineered a lightweight, environmentally responsible solution for raising ground levels within a Root Protection Area (RPA) at The Hydons, Hydestile, Surrey. The project required a no-dig approach to protect mature trees while creating a level garden space for improved aesthetics and usability.

 

The project required a no-dig approach to protect mature trees while creating a level garden space for improved aesthetics and usability.

• Root Protection Area Constraints: The garden required raising levels by 400mm without damaging tree roots.

• Weight Reduction: Original specification using 4/20 clean angular stone was too heavy; a lighter solution was needed to reduce compaction.

• Environmental Sensitivity: The design had to maintain water and oxygen movement for healthy root growth while improving drainage and aeration.

Get your quote today!

"*" indicates required fields

Name*

Register your interest!

"*" indicates required fields

Name*

Please complete the form to request access to the resource.

"*" indicates required fields

This field is hidden when viewing the form